T-2

Yesterday, Enough Pie visited us at the wood shop to see how the construction documents were coming. In addition to the construction documents, we also presented the mock ups of the trailer details we had shown. Our papers are now completely covered in red, and we will be working to fix them for Friday when Kevan Hoertdoerfer stops [...]

THE ROAD TO CONSTRUCTION

Today we will meet with Enough Pie and Architect Kevan Hoertdoerfer to show them the mock ups and construction documents we’ve been working hard on for the past week. We’ll be able to show them at a smaller scale how things connect and how they will open & close. This is a great opportunity for [...]

Down To The Wire

Finalizing our plans and details is what Studio V is up to. We have been working on our construction documents for the past week and after knocking out all the necessary details Tuesday night, down to the exact measurements of the materials needed, we are about ready to start fabricating! As it has been said, [...]

Beginning Detail Mock-Ups

Our new home, the workshop. Yesterday in studio, we talked about the details we worked on the night before. We sat down with Professor Pastre and discussed what was working and what needed to be changed. Through talking it out with Professor Pastre, we were able to find potential complications with our designs, but at [...]

GETTING STRUCTURED

On Friday we met with structural engineer John Moore of 4SE, Inc. to get feedback on the details and framing we have come up with for the Vat Shack as well as the structure of the trailer we will be using to build the shack on. We got some very good criticism from Mr. Moore [...]

Awesome!

I just said awesome!         Upon completing final Documentation tomorrow Studio V and our time at the CAC.C will be complete! It has been a long ride but an unforgettable experience. Not only have I learned about practicing architecture, a new construction method that I never thought possible [Sim]ply, or the process [...]

Packed and Ready to go!

After the past few months of working on Crop Stop 2, mocking up, drawing construction documents, and designing the exterior, we are finally ready to pack up and move up to Greenville for the actual build. This is a big step for the studio; because we wont be able to get to the actual build [...]

The End is Near

This coming month is the last month of school, which means the last month of studio. So today during class we made a calendar of what all we have left to do for Studio V. We included the final dates for our classes and when our mock up review will be. After we made our [...]

We Made It!

Yesterday evening around 5:45, we arrived to Clemson for our weekend of helping build the Solar D project. At 6:00 everyone met at Rick's Pizza Pub in Pendleton. At dinner, we got to meet with the rest of the Indigo Pine team. We also went over the initial itinerary for tomorrow and the rest of [...]

Crop Stop 2

Friday before spring break we analyzed our digital model for crop stop 2 and looked for missing pieces on site. We created an inventory that contains pieces we already have at the shop, and made a note of the new pieces needed. During spring break we have received some redlines and feedback from the engineer, so [...]