Crop Stop 2

Friday before spring break we analyzed our digital model for crop stop 2 and looked for missing pieces on site. We created an inventory that contains pieces we already have at the shop, and made a note of the new pieces needed. During spring break we have received some redlines and feedback from the engineer, so now we are working on the permit set. We have made a lot of corrections on our drawings in order to make information consistent and relevant.  It is important for us to have all construction drawings organized because coordinated documents are essential to minimizing construction delays, misunderstandings, and subsequent cost overruns. cropstop2

Comments
One Response to “Crop Stop 2”
Trackbacks
Check out what others are saying...
  1. […] for the pieces that need to be modified or made to complete Crop Stop 2 framing as mentioned in the previous post.  We are hoping to have the files needed for the completion of the Crop Stop 2 framing system cut […]



Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: