Almost Done with Steel Framing

After classes yesterday, we met up at the shop to work on the project. Yesterday we put in the two ridge beam posts and started putting in the ties that connect the two ridge beam posts to the rest of the framing at the top of the structure. It involved a lot of checking and [...]

Rolling with the Punches

As we move along through this process of building the Indigo Vat Shack we are starting to realize just how far we have come since the beginning stages of designing three months ago. Suddenly, this structure we have been designing is starting to take shape and we are a little over two weeks from the [...]

AND THEN THERE WAS FRAMING

Things are starting to come along on the Vat Shack as the framing has begun to take shape. As stated in the previous post we are measuring 3 times before we cut because this is a precise process. With the majority of the framing up we can start measuring, cutting and welding the steel grate [...]

Teamwork and Support

We have acquired a significant amount of our materials and the metal work process is going well. As a class we are efficiently taking turns welding, cutting, and grinding metal down to create our structural system. We have a system that is working to great affect. We have put down our sleepers which are horizontal [...]

Building the Base

Wednesday was an exciting day for us here at the workshop! After the first shipment of steel came in Tuesday, we dove right into measuring out the new pieces of steel and marking up the trailer. We decided to divide and conquer and so two of us continued using angle grinders and cutting discs to [...]

Supplies Are Coming In

It's an exciting time at the shop. Pastre has been talking to companies about donating materials for the project, and they are coming in now. We've gotten some steel tube, steel angle, and the steel grate. These supplies will be used for the floor foundation and the flooring. We're using steel tube for the sleepers that [...]

Welding: The Craft

After a somewhat frustrating few weeks, Studio V is ready to release some steam. In order to do this, we're going to weld! For a group of 7 undergraduate architecture students, construction is a mystery. Because of this, the last few weeks of working on construction documents have been extremely frustrating. We are all pretty [...]

Just Your Average Trailer Breakdown

As mentioned in the last post because of the rain we were unable to work on the metal framing of the trailer, however, today was extremely productive. We cut through the sides of the trailer with the portable bandsaw, as you can see in the featured image when clicking on the blog. Also, being done [...]

LET THE DISASSEMBLY BEGIN

Over the weekend we were shown how to use a plasma cutter in order to remove the pieces we don’t need on the trailer and start building on top of it. It rained on us Sunday so we couldn’t dive into it as we planned, but today we will be getting to work on the [...]

Loose Ends

We're back from Spring Break with a lot to do before we start building. Last Friday, we realized that we still had a lot of loose ends with our design and our drawings. We decided to stay after studio to finalize our design and understand what we had to do over Spring Break. We developed [...]