Hard Work Does Pay Off

  As we continue to push ourselves everyday with the Cropstop, the results can really be seen as you step back and look. One of the biggest realizations is...how big it really is! 60' by 12' looked ok on paper, and some areas even seemed small. But now that it is built up with walls [...]

Learn from the Set Backs

As Studio V learned the hard way yesterday we are bound to make mistakes. This project is most of our first building and construction experience. The building level is amateur for most of us and mistakes are bound to happen. The real key for Studio V is to learn from the setbacks and keep moving [...]

Picture Perfect Framing

Thanks to our teacher's help with the framing details for the chassis (and by help I mean complete overhaul of the original documents) we have completed the framing for all walls in the Crop Stop. After all the walls were standing, wouldn't you know that they all fit together! Usually when I make things by [...]

Paint and Flooring

Today Studio V is finishing up the final welds to reinforce the chassis and starting to paint and frame the flooring of The CropStop. Welding has been a blast to learn and the chassis is going to look brand new after the fresh matted paint job. Nothing has stopped Studio V as most of the [...]

If you ain’t burnin’, you ain’t learnin’!

The chassis had been ground down and de-rusted using a special chemical that changed the iron oxide into iron phosphate. This stabilized the steel and prepared it for reinforcements to be welded on. The way the chassis is constructed, there are two larger beams that run the full length from front to back, with flanges jutting [...]

Refreshed and ready

Our spring break is now over and I think I can say at least for myself that I needed every bit of it.  It was great to relax for a short while.  Our studio has been pretty much full throttle the entire first half of the semester.  I'm sure the trend will continue into the [...]

Ready or Not

Yesterday, Studio V made a short field trip over to the local Public Service Building to learn a little more about the permitting process and the steps that have to be taken in order to get construction documents approved. It was a little overwhelming to see hundreds of rolled up plans lying in piles awaiting [...]

Down to the Nitty Gritty

This Monday we continued to produce, examine, and refine our construction documents. We took an in depth look at things such as how our facade will attach to our exterior walls, corner details, as well as roof framing details, and how it will meet the walls. The team has also been refining the budget by [...]

Our kitchen has a home

  On Saturday, the studio made our war to Sangaree Homes & RV's, where our mobile chassis is located. We completed the demo work from last week and now our kitchen has it's base. Check it out:     Alright, it may not look like much now, but in a short two months there will [...]

In a “Door” Jam!

As we move forward from our review on Wednesday, it is time to get to work on the details of the project. There are plenty to choose from, from the roof structure to the ADA ramp. However, we have been challenged to figure out the best way to enter into the kitchen. The first thought [...]