Site Work Imminent?

As we approach Thanksgiving we are all very eager to get on site and get started. On Wednesday we finally got a good taste of working on site. Our rebar was delivered at Singleton Park so we got a group to go out there and start cutting and bending them into loops according to our [...]

Persevering Through the Problems

As we come back from Fall Break we've hit some snags on our pavilion project: waiting for permits.  Now even though we can't yet break ground that doesn't mean we twiddle our thumbs waiting for something to get done. On our first day back we had some crews put together some more sheets for permitting [...]

Laboring Through Labor Day Weekend

As we venture upon the Labor Day holiday weekend we've got a few crews working on our different community build projects. We've been hard at work getting the semester started and are eager to get back on track after our hurricane days. Most of our studio can be seen in the woodshop during class hours [...]

1 Week To Go

We've got one week left of classes to go before finals and we're all hard at work together to finish up the various projects left. Most of Friday was spent in the woodshop, cutting wood to get ready for a trip back to Frierson or working on metal for the bridge at Ardmore. Kevin's butterfly [...]

Trellis Mock + Site Lines… check!

This weekend the community Build studio split up into two groups, team "mock up" and team "site lines". Team Mock up worked in the shop preforming welds, angle grinding, and wood cutting to assemble a mock up of our trellis design. Pictured below is a full scale mock up of a portion of the trellis [...]

TRUSS THE PROCESS PT. 2

The past 4 days have been crazy, from getting all the shop drawings, lumber, cutting the lumber at weird angles, painting, & assembling the parts and pieces. Coming into the shop from 9:30am to 1:30am everyday was really tiring. But we can finally see the pavilion and how cool it really is going to be. [...]

HAPPY HALLOWEEN 🎃👻

Over the weekend, Ailed, Yage and I had mock-up one of the five benches on the north side of our pavilion. We did the bottom portion of the bench and the bench composed by the two 2x6 supports, fourteen 2x4 seating slats with 1/2" spacing. The mock-up was very helpful, we had people sitting on [...]

Pythagoras, my hero

This weekend was a long one. We're nearly done with our CDs and about ready to start the mockup. On Saturday, Katie, Perry, and I went to the site to take out a portion of the community garden fence and mark out the extents of our concrete slab. Armed with 3 tape measures and a [...]