Studio Design Updates

The studio’s first design review is quickly approaching, and we’re in full production mode, refining our final design decisions before moving into creating presentation-quality drawings. Our shared workspace is a testament to the process, covered wall-to-wall with sketches full of the design iterations of our ideas, soon to be accompanied by physical models we will [...]

Non-Profit Organization Selection Day!

Today was an eventful day for myself and all of my classmates at the CAC.C. In Community 1:1, we all conducted research on the 10 provided Non-Profit organizations. Based on our research, we decided which organization we fit with the best to work with throughout the semester. David Pastre brought us all together to go [...]

Forging Brilliance – Where Grit Meets Design

In the heart of Charleston's Old Towne Creek Park, 10 of us are crafting more than just a pavilion—we're shaping a community. This project, part of Clemson's Community Build Program, began with individual designs that evolved into collaborative concepts presented to the Parks Department, receiving great feedback both times. After rigorous sessions, we finally settled [...]

Be Prepared!

Over this weekend we spent time to further prepare for our build on site. If everything is cut and drilled correctly, it should all come together relatively quickly. This week has been spent working on our 6x6 columns and our 2x10 elements throughout the build. With drawings in hand, we have been hard at work [...]

It’s all in the Formwork

Today, we completed one of the most challenging parts of our build, the formwork! We have a total of 8 forms that will mold our concrete "feet" for wooden columns to then support the structure. One of the most difficult parts of building the formwork was to have flush edges and strength, and doing so [...]

Everything Everywhere All at Once

To wrap up this week, we’ve been working in the shop most nights on cutting down material for formwork then assembling them. The process of cutting the material down and getting them ready to assemble started off rough but we now have a system in place to make things go more smoothly. For our ITC [...]

Busy day in the Shop

Today was a busy day in the shop. As a recap, half of the students in the ITC class are working on a model staircase project which is meant to be a lesson on bent wood laminations and complex formwork needed to build them. My team was hard at work over the weekend and today, [...]

We Built a Bridge & Got Over It!

As we wrap up this week, I wanted to give a summary of the projects that were completed. We’ve had many things going on in the architecture department at the Clemson Design Center this week. The Ardmore project is wrapping up on our end as the planter boxes have been built and taken to site [...]