Construction Drawings vs. Shop Drawings

Shop drawings (also known as fabrication drawings): are detailed plans that translate design intent. They provide fabricators with the information necessary to manufacture, fabricate, assemble and install all the components of a structure. In this project, we are the fabricators, manufacturers, and installers for every component our design. As we move towards the end of [...]

Design for Detail

Good Morning! This weekend we have been hard at work producing structural drawings to send to John Moore today for redlining. The class has broken into several groups to tackle the memorial garden layout, storage and seating, the trellis structure, and the buildings. I have been working with the team to finalize the structure for [...]

The Studio that Never Sleeps

After a long week of finalizing our design it seemed that no one would ever come to a concrete decision that would be universally agreed upon. When that finally happened, it was well within the "final hour" to finish deliverables for our presentation to Frierson Elementary today. We all met up and acted as a [...]

Progress from Setbacks

A great architect once told me that design is never finished, you must simply decide at what point do you move on. This is something that every architect struggles with, and we are no different. This week we struggled a lot with finalizing a design, iterations brought new and exciting ideas but also created more [...]

13 Minds, One Structure

As we are moving along with our Final Design, I feel it is important to speak to the methods in which we are communicating and how we are navigating 13 opinions for one final design. Working with a group of two at times, let alone 13 people can be quite the challenge. It becomes an [...]

Got Structure?

Today, each of the teams have been hard at work so that we will be ready to combine our ideas tomorrow into one cohesive design to present to the students and faculty at Frierson Elementary on Monday. As part of the structure team, we had the task of figuring out a roof design and column [...]

Laying Out our Layout

As we get into the design side, sometimes we can get stuck in the middle of the design and not see the bigger picture. We can get caught up in how the building looks and not how it functions. When this happens, the best thing for a group to do is to step back and [...]

Slicin’ n Dicin’

Monday’s studio time was dedicated to assembling and finalizing our boards for Wednesday’s presentation at Frierson Elementary. This presentation will be an opportunity for the team to show Frierson all of the research and precedent studies we have done over the past couple of weeks. We want to be able to show and prove that [...]

Giving the Handrails a Facelift

Our second project for "Spring Cleaning" is at Forrest Park where we tackled some small repairs on the bridge. The bridge was completed in the Fall of 2020 that utilized tensegrity as an architectural form for the basis of the bridge. Using steel rods as cables, the bridge works in tension to connect the Bikeway [...]

Meet the Team!

Now that “Spring Cleaning” is underway and nearing completion, we will soon jump into research and designing the next Community Build Project. Before we get too deep into the semester, let’s take a moment to meet the team! Gauge Bethea Where are you from: Sumter, SC Year Level: MARCH II Hobbies: Taking long drives, kayaking, [...]