Design for Detail

Good Morning!

This weekend we have been hard at work producing structural drawings to send to John Moore today for redlining. The class has broken into several groups to tackle the memorial garden layout, storage and seating, the trellis structure, and the buildings. I have been working with the team to finalize the structure for the building. We’ve designed, redesigned, and designed again, but alas! we’ve had many exciting changes over the last 48 hours that have brought the design closer to completion.

Once we had the green light on the grid layout and trellis connections, we hit the road running with details! The trellis team has drawn out the connection pieces for each steel member, and the building group has sectioned the building to show how each rafter and column connect. We’re excited to hear back from John and continue improving on our CD set…One step closer to breaking ground!

 

Leave a Reply