Design for Detail

Good Morning! This weekend we have been hard at work producing structural drawings to send to John Moore today for redlining. The class has broken into several groups to tackle the memorial garden layout, storage and seating, the trellis structure, and the buildings. I have been working with the team to finalize the structure for [...]

Got Structure?

Today, each of the teams have been hard at work so that we will be ready to combine our ideas tomorrow into one cohesive design to present to the students and faculty at Frierson Elementary on Monday. As part of the structure team, we had the task of figuring out a roof design and column [...]

Well Well Weld

Know Your Material As designers, we often get into the habit of conceptualizing ideas that are.... well, ideal. So when it comes to the process of grounding them in reality, many of us tend to get a little frustrated. It is easy to say "just hand it off to the engineers and let them see our [...]

Truss in the process…

The trusses are cut, primed and assembled, and after a short layover in the painting booth, they will be on their way to the site! The project is progressing rapidly now and it won't be long until the pavilion will be ready for action! Because all the pieces are prefabricated, we should be able to [...]

Teamwork and Support

We have acquired a significant amount of our materials and the metal work process is going well. As a class we are efficiently taking turns welding, cutting, and grinding metal down to create our structural system. We have a system that is working to great affect. We have put down our sleepers which are horizontal [...]

GETTING STRUCTURED

On Friday we met with structural engineer John Moore of 4SE, Inc. to get feedback on the details and framing we have come up with for the Vat Shack as well as the structure of the trailer we will be using to build the shack on. We got some very good criticism from Mr. Moore [...]