Stable Gables

This week is a big week for our crew as we've been split in two since this past weekend. One crew has been on site assembling the diagonal steel membranes on the trellis and beginning to raise the gable pieces of the large slab structure, while another crew has been in the shop meticulously assembling [...]

Meet The Team

While part of the group is out on site today completing our final concrete pour, I'd like to take the time to introduce our team! There are some old faces that you've seen in last semester's blog posts, and some new faces that have joined us for this semester. Although it's been a little rough [...]

Up and Coming

This Past Friday we completed our first of the two concrete pours. The small slab and the first pour of our trellis was completed. On Saturday we went back and removed the formwork from the small slab and cleaned it for it to be reused for the larger slab. We then started working on the [...]

Riders of the Storm

As Hurricane Ian approaches we had to get things ready so our hard work wasn't ruined! The worry is that our earthwork that was dug out will get messed up so wed have to re-level things and fill back anything that collapses. I am hoping that the stakes and fence line do not get uplifted [...]

Continued

This past week was full of introductions and picking up where the previous semester left off. We first reviewed details about our client, THE site, and the programming of our structure. Dave told us newbies the importance of the OSF (Office of School Facilities) and its long inspection process of the architectural drawing set. Since [...]

Nearing the End

While we are definitely bummed about postponing building until the fall semester, we are excited that we can still show off part of our design with a full-scale mock-up! We've been busily priming and painting all of the steel members for the trellis assembly, which will be part of our mock-up. The yellow, blue, and [...]

Pushing Forward!

Welcome back to another installment of late night Studio V work! This week we’ve been nonstop grinding and welding and as you can guess, punching and painting. We’ve said it time and time again, we are hard at work trying to meet deadlines and produce a quality build for Frierson Elementary and the surrounding community [...]

Prep Work

As we continue to hone our skills in the shop, cutting, grinding, and welding, we are also continuing to do work else where. First off digitally.  We started doing our shop drawings the week before break and have been continually working on them. Refining them, adding changes, and stream lining them. This will ensure that [...]

Construction Drawings vs. Shop Drawings

Shop drawings (also known as fabrication drawings): are detailed plans that translate design intent. They provide fabricators with the information necessary to manufacture, fabricate, assemble and install all the components of a structure. In this project, we are the fabricators, manufacturers, and installers for every component our design. As we move towards the end of [...]