Shop Drawings and Formwork

As the semester has progressed on through design iterations, presentations, and cd sets, it finally is approaching "go time". This week is a full send on shop drawings and material counts / orders so we may start fabrication in the wood shop as soon as this weekend or next week. Currently something that I have [...]

Steel & Stone

This week marked a significant milestone in our community build project: we completed the foundation work! This step is essential in any construction project, setting the groundwork—quite literally—for everything that will be built on top. Here’s a look at the process we followed and what it took to bring this foundation to life. 1. Excavation [...]

Meet The Team

While part of the group is out on site today completing our final concrete pour, I'd like to take the time to introduce our team! There are some old faces that you've seen in last semester's blog posts, and some new faces that have joined us for this semester. Although it's been a little rough [...]

Concrete Paths are Hard

Before we could actually pour the concrete pads and path for the bridge, we had to dig out the earth for it. After a long day of shovelling dirt, dirt, and more dirt for the concrete pads that would be at the small bridge and one side of the main bridge, we decided that borrowing [...]

“Work Smarter, Not Harder”

"Work smarter, not harder."  Sounds like something my father or grandfather would tell me, gently chiding me for making something more complicated than it needs to be and then instructing me on a way to do it better, faster, more accurately - or giving me a better tool to do the job.  That's another phrase [...]

Headway at Medway

We are making progress on the slab. Due to an afternoon field trip for another class yesterday, we weren't able to make it to the site until around 5:30pm, right as the sun was setting. We quickly got to work tamping the soil and fixing the walls of the turndown, making sure they were vertical [...]