First review

Over the past several days we have been divided by pairs of two to start the design process for the new bridge at Mulberry pond. Half of the class is working on the west side of the pond while the other half is working on the east side. Every studio last week we meet over [...]

Fully Formed

Things are moving along great at the site as we get ready to pour concrete this morning! We saw some really awesome team work on site yesterday and Wednesday as we set our forms in place and set rebar. Yesterday the focus was rebar and getting it inside of our forms and braced. A few [...]

Redrafting and Revising

After our review on Monday with Cole and John, we've been back at the drawing board finalizing some structural details and connections. It was awesome to be able to talk to both of them about our designs, they gave us some really valuable insight on a lot of things we were a little uncertain on. [...]