Iterations on Iterations

Everyone has their part to play in finalizing the various details of our design before construction begins. Whether be iterations for the trellis, storage benches or display walls. Over the weekend some were working on more iterations based on discussion from Friday, while others were model making to flush out the logistics of the designs.  [...]

Numbers Can Cause Headaches

Pictured: David Pastre brainstorming solutions with the students. Getting back into the groove this semester hasn't been easy for anyone, but things are really starting to pick up pace. It has been all hands on deck to get material counts, design, adjustments/changes, and an updated cost estimate completed. As we work through these details we [...]

Friday Project Prep

This Friday the studio continued to begin organizing/designing components of the project. Some groups are working out drawings for the decking structure, others are designing smaller components, the project schedule/calendar is continuing to develop, and cost estimation is in the works as information is being collected. The rainy afternoon set some good vibes for the [...]

Order of Operations

Not to be confused with PEMDAS, we’re currently figuring out the most efficient use of our time while we wait for the next steps of the project. Since we are waiting on the MOU (Memorandum of Understanding - a fun part of the legal process that we got to learn about) and the permits to [...]

Still cutting, welding, grinding

The group has been making steady progress as we get close to wrapping up the semester. Yesterday we continued working on a variety of tasks. We just received structural updates from John Moore on the project with the Conservancy of the Sea Islands. With this information, we aim to apply the corrections to our construction [...]

Sending out CD sets to Engineer

This week, unfortunately, David is in the Dominican Republic, where he's probably lying on the beach while we are in the studio doing construction documents. All jokes aside, everyone has been working hard to finish the CDs for sending to the engineer, John. Let's go, TEAM! We divided everyone in the studio to work on [...]

Working Out the Details

Friday we took some time to determine where we were in the process of being able to produce construction documents. Our goal is to have them done in a timely manner so that we can get as much feedback from John Moore, our structural consultant, as possible. After discussion on larger scale elements within the model, we [...]

Book Club at Hampton Park

Yesterday we had a momentary break on studio production to hold book club of Out of Architecture at Hampton Park. It was perfect weather and not too sunny under the shade of the trees, although everyone did leave with a little Spanish Moss entangled in our hair. Many brought lunch or coffee from local spots [...]

Structural Engineer “John” Comes

Today in Studio a structural engineer, John, came to review our project and give structural advice. As we move into the construction documentation phase of the community build project, all the designs/concepts need to be tested practically and logistically. While our studio had a good idea of how the structure would be constructed, John will [...]