Revit Wizardry

We are hard at work taking the Gathering Ground Pavilion from design to construction documents in Revit. Now that we are all on the same model, we can be very exact with material sizes. This gives us the ability to push and pull the design in a way that allows for cost efficiency and the [...]

Last Day Before The Metanoia Block Party

Tomorrow is the Reynolds Avenue Homecoming event for our Intro to Craft class. The groups have been working hard this week to produce cardboard installations, graphics, and signage for this event. My group has been working on an installation that draws from the ropemaking traditions of historic Charleston, and the sensory experience of light, to [...]

Iterations

As we have been working through our small group design phase, the buzzword in the studio has been "iterate". We are all trying to work through this repetitive phase of communicating design ideas, combining perspectives, narrowing down a design goal and narrative, and iterating through variations of these concepts to create the best possible solution [...]

Half-Scale Model Complete & Shop Drawings Underway

This week, studio made significant progress on the Plymouth Park pavilion. Today, we completed the half-scale model of the truss system, letting us do a test run of construction to learn from and better understand how the structure comes together. This not only helped us refine our construction process, but also prepared us for the [...]

A Fast Start To February

In the Community Build studio, the beginning of February has been eventful. We are currently moving towards a February 18th deadline as we work to synthesize our many ideas and narrow down our final group design to be proposed to the city. Most of the studio met yesterday to compare sketches and study models, then [...]

A+cB Moving Along

We just sent out our CD set on Friday! This week, we will move forward this week by putting together our shop drawings, learning how to weld, and going out to our site to re-lay our slab. Soon we will break ground and level out our site. It won't be long before we are bending [...]

Organized Chaos

With the shop now in order and the bulk of the formwork complete, the Community Build Studio is ready to take on some of the prefabrication of the framing elements. While David continues to make the necessary arrangements for our permitting and subsequent groundbreaking, the framing members will start to be cut and organized to [...]

Nothing’s Set in Concrete (Yet)

It was all smiles in studio on Friday as the crew geared up for what will be exciting week beginning site work. Studio began with the group gathering to review potential color schemes for painting the pavilion. Everyone has been working hard in their individual groups this week to prepare for finally breaking ground this [...]

Bringing the Drawings to Life

As the week comes to an end, the Frierson group is working to execute the prefabricated elements for the counter, bench, and door handles. Because of the long commute to the site, we are staying in the shop this week to precut and weld as many pieces as possible. It is crucial we start pre-assembling [...]

Schemin’ & Dreamin’

Studio began with a design charette for the project in Eric Cornelius Singleton ll Park. Everyone was split into 3 groups of five and given 30 minutes to create a scheme on the site for the community garden and pavilion that we’re looking to design and build. After the 30 minutes, we gathered to discuss [...]