Came Out on (table) Top

Yesterday, the studio continued working on constructing the table and benches for Stephen Washington Park. We worked in two shifts, one in the morning and then an afternoon shift that quickly became the night shift after some hiccups. As the afternoon team rolled in, all the pieces were cut and mostly grinded, so a lot [...]

cutting, welding, grinding

Studio right now looks a lot like this. People grinding, welding, cutting, cleaning, prepping. We are all fabricating last years community build groups project extension of the bench and table to meet the ADA requirements. Additionally others are working on finishing up there community 1:1 non-profit projects. WAY better than sitting in studio on a [...]

THE END (of book discussions)

Our final book discussion of the semester has concluded at Goat. Sheep. Cow. Finishing up the book, Out of Architecture, we discussed potential changes to the education of architecture as well as changes to the profession. Some ideas we had about education were reducing the number of total years in architecture school, adding more technical [...]

Working Out the Details

Friday we took some time to determine where we were in the process of being able to produce construction documents. Our goal is to have them done in a timely manner so that we can get as much feedback from John Moore, our structural consultant, as possible. After discussion on larger scale elements within the model, we [...]

Revit Model!

The group is still working on the Revit model for Conservancy of the Sea Islands. As many architecture students know nothing is ever really finished when we want things to be finished. A schedule/plan is a more looked to as a good idea and what we are striving towards... ALSO thanks to minecraft brain and [...]

Revin’ up Revit

Last Friday, the Gathering Ground team discussed a game plan and timeline for modeling the final design in Revit and producing the CD set drawings. Now that we all have access to a central Revit file, one team (Hamilton, Kaden, and Tyler) are working on modeling and laying out the column and deck grid. At [...]

Revit Wizardry

We are hard at work taking the Gathering Ground Pavilion from design to construction documents in Revit. Now that we are all on the same model, we can be very exact with material sizes. This gives us the ability to push and pull the design in a way that allows for cost efficiency and the [...]

Structural Engineer “John” Comes

Today in Studio a structural engineer, John, came to review our project and give structural advice. As we move into the construction documentation phase of the community build project, all the designs/concepts need to be tested practically and logistically. While our studio had a good idea of how the structure would be constructed, John will [...]

Calendar Clean Up

After a relaxing spring break, we decided it was time for some studio updates. First, Vivian shared her experience presenting at the board meeting for Conservancy of the Sea Islands last Tuesday. The board unanimously approved both the overall design and the proposed budget, which was exciting news for our team. Though the highlight of [...]

Final Design Presentation to the Client!

Yesterday, our class had an in-person presentation to the Conservancy of the Sea Islands Board Members and a Zoom meeting for the people who couldn't attend. It was a very productive meeting; we had many conversations about our design, and great ideas emerged as we discussed it. Kaden and Nolan presented for all 13th of [...]