While half of the team is on site working with columns and beams and getting them set in place, other members of the Studio V team are back at the shop preparing the vertical garden. The vertical garden is made up of steel angle frames along with wire mesh that will be welded together once everything is prepared! Over the past week we were able to finalize cut sheets and begin cutting the wire mesh down to three panels. These panels are then being cleaned and treated with a solution to prevent rust. Once all the steel angles are cut we will be punching holes for the bolt connections and then welding the frame and wire mesh together! Everything is starting to come together nicely and we are excited that our completion date is right around the corner!
Stay tuned!