Enough Prefab, Let’s Get to Site!

After weeks of prefab work in the woodshop, we have finally completed all of our steelwork and movable wall partitions! Let’s hit a quick recap of our busy week last week.

Pictured Above: A finished movable wall partition (left) and finished overhead trellis (right)

With the steel combs arriving last week (thanks to Robert Thomas Steel!), the team wrapped up welding and fabricating the overhead steel trellises. These combs were lasercut with their steel lasercutting machine to create a piece of steel which can nest into our long steel pieces. Since the trellises are so long, this comb piece was essential to ensuring that the trellis stays stable and doesn’t bend and warp.

Pictured: Welding (left) and setting up (right)

Welding these bad boys was only part of the battle though, next was moving them all into the hallway for temporary holding. Built with solid steel bars and measuring between 10 – 14 feet, these trellises are heavy as you can imagine! So, it goes without saying that moving each one of these has to be a team effort. Here’s a peak into what that looks like:

Pictured: Pivot! Pivot!

Now that all of our steelwork is done, both the overhead trellises and the vertical woven wire trellises will be sent off to the powder coaters to get a nice bronze finish. This will ensure that the steel is protected from water and other corrosive weathering, but also that it aesthetically looks cohesive with the rest of our build.

For the walls, despite hitting some unforseen issues during assembly, they are ready to wait for installation too! While assembling the walls, the team discovered that some of the lap dados were slightly too deep. To fix this, we began creating thin shims which would be able to fill these gaps. Safe to say that this at least doubled our wall assembly time. It was a complicated and lengthy process, but ultimately the walls wrapped up on Friday with the steelwork.

Pictured: Hamilton helping to hold down boards while Tyler screws them in (top left), David troubleshooting with the team (top right), the team working together to assemble a wall (bottom)

On Friday, while the wall and trellis teams were wrapping up, a few of us went out to our trailer to make some adjustments ahead of going on site this week. Another group went on site with David to finally begin some site work. They trenched some of the site and laid out our silk fences for final approval from the rezoning and permitting officials. With this complete, our hope is that this week sometime we will be able to get on site and begin building our pavillion!

Pictured: Vivian closing up the trailer

In other news, my Community 1:1 project from last semester is still going. This semester, in addition to all of my regular courseload and projects, I have been continuing my work with the Charleston Library Society to create new Little Libraries for The Book Drop childrens initiative that they run. Over the past couple weeks, I have worked with David Pastre and Matt Corbitt to fabricate another prototype for a Little Library. It was cut on the CNC and then assembled. Assembly proved more complicated than expected, so there will likely be another round of adjustments and another prototype completed before I leave Charleston.

Pictured: Little Library Assembly and Glue Up

That’s it for our week recap and gameplan for the week. Talk soon!

 