3x4x5

This week we have broken up into three teams (Frierson, Ardmore, and Singleton). With only a few weeks left of class we are trying to push out some final things with all of these projects. Frierson l has some work that is being finished to it. Ardmore has planters and a bridge installation that will be done. Singleton has some final design work that needs hashed out and we are working and in communication with the students at ICAR to produce composites this summer.

This week I met with the the composite TA and professor to discuss some final things they need to design their forms. Therefore, we have assigned a meeting to happen with the engineer next monday so we can discuss loads on the member and figure out our structure more.

Today we marked the site out at singleton. We painted the layout of both the large and small pavilion. The process of doing this was configuring where the edge of our buildings would hit from the road and measuring. From there we painted out our slabs foot prints. This required us to measure using a 3x4x5 triangle method to make sure our lines where square and straight.

Leave a Reply