Shop Hours

Fall break weekend was really productive for the studio. We Cut all the wood for columns and rafters. The 6×10’s and 6×8’s are being moved to the Mitre saw and cut to size and mitred. On Wednesday the studio split into three different groups. A crew continued cutting the wood, another crew finished up welding the plates for small slab. A small group went to site with David to put up the 2×6’s on trellis.

                                                               

The crew from site returned with most of the 2×6’s done. All the plates are welded and the wood for rafters and columns are cut. Friday We’ll be drilling holes in our large slab gables and start moving them to site this weekend. With everything going as per plan, we should have all our gables up before we break for thanksgiving.