Friday we split up into two groups to push the design we chose over the weekend. Yesterday we presented what ended up being two very similar ideas. After lots of collaboration and back and forth we decided on the design that we wanted to push for our meeting with the parks conservancy that is set for Wednesday.
What made yesterday different from previous design days was receiving the topographical information from the survey of the site that was taken last week. We now know the elevation changes that have to be achieved, as well as the heights in reference to the pre existing path of the bikeway. Now as we further our design different components become more detailed. The fun part of figuring out the right connections to make this crossing work begins!