We are now in the last few days of preparation before we begin construction on the final pavilion. Right, now we are mostly divided working on individual tasks such as pricing, construction documents, detail drawings, and mock ups so that we are fully prepared for whats to come. Hopefully, by the end of today we will have all the necessary pieces to send to the BOA and town in order to get our design approved for construction. In the mean time it is crunch time in studio and everyone is working extremely hard to get everything done and figured out.
The energy in studio is good as everyone is anxious about completion, but ready to move on to the next step of the project. This weekend will more than likely be spent both in Clemson and on site doing either demolition or cutting roof tiles on the cnc router. The finished project is going to really be incredible with the amount of detail and precision that we have chosen to pack into a tiny 250 square foot shade structure. It’s an exciting time in studio V and we are all excited to see a final result.