TRUSS THE PROCESS PT. 2

The past 4 days have been crazy, from getting all the shop drawings, lumber, cutting the lumber at weird angles, painting, & assembling the parts and pieces. Coming into the shop from 9:30am to 1:30am everyday was really tiring. But we can finally see the pavilion and how cool it really is going to be. … Continue reading

Blast From the Past

The past few days have been primarily demolition and construction. This is the first time for everyone in our studio that we are building something we have designed ourselves. We have moved from models, drawings, and the computer into the real physical world. This experience has been an eye-opening one. Understanding the practicalities of building … Continue reading

Setting the foundation-Proceed at your own risk!

This weekend my studio v friends along with our professor tore down the old reading structure that once stood in the same relative location as our new structure sits. Today we started setting the post in the ground and making sure everything will line up exactly like we need in order to get our beams … Continue reading

CAMARADERIE

These past 2-3 weeks have been the toughest, most hard working, work cranking weeks of the semester so far. We’ve spent hours before and after scheduled studio, spent entire nights, and entire weekends in the studio. Last week we proposed a few designs after a long weekend to our engineer. We made a few different … Continue reading