A Short Spring Break Story

Today marks the first day back in studio from Spring Break last week. The week before break we made a lot of progress on the donor wall for the Old Towne Creek project. We managed to get all three walls framed and walled with MDO within about a week of studio time. We did have to leave one side open in order to leave room for the installation of a power box and the mounting of the donor wall art piece but overall, it was a productive week. Outside of that progress, not much has happened since. So please enjoy this short group of pictures that tell the story of my beach day in Folly during Spring Break.

Thank You.

Leave a Reply