Wednesday in studio we broke up into multiple teams. 1 group went out to site and marked the pavilions locations. The 2nd group worked on tearing down the walls at Green hearts existing site. The 3rd group worked on finalizing form work for the concrete pier foundation. And the last group which I was in worked on the redlines John Moore the structural engineer sent.
These where very minor details. We had to edit our rebar details. The rebar will stick out of the ground and we had to detail out the logistics of where these U’s occur. We also had to add a few details that we had left out. One of those being the turn down detail on the small pavilion.

FOUNDATION DETAIL SHEET

REBAR PIER DETAILS
Aside from working on the CDs I have been designing the small pavilion built ins and starting the shop drawings for that. It consists of a sink storage space and wall mounted storage that is connected to the walls.