Framing Fixes

As mentioned in my previous post, there were issues identified with the prefabricated wall frames that needed to be fixed in the shop before they could be sent out to the site. Yesterday Kyle, Hannah, Shelton, and I worked on fixing the frames and polycarbonate so that they could be ready to ship out to the site.

We completed eight of the wall panels, bringing our total of completed wall panels to ten. Along with the wall panels, we also finished a door panel. We did have some setbacks during the day such as running out of fastening screws and the blade that is needed to rip the polycarbonate sheets above not being delivered in the mail. Today our goal is to finish the remaining panels so they can be shipped out to the site on Friday to be installed on the structure. There are two wall panels and seven door frames to be assembled.