Yesterday was the first day that we, as a class went out to the site of the build to work on it. Before the majority of the class showed up to work, the holes for the slab were dug out. During the time that we spent on the site, we were able to level out the dugouts for the trellis foundation, set up a safety fence around the perimeter of the site, prep a bunch of rebar for Wednesday, and locate the position of where the forms for one of the slabs need to be placed.
So it begins…

