Making Progress

Since being approved to start building, we have made a lot of progress. A huge thank you to Blu Tide for installing our pilings for us! Now that the scaffolding is done, we can move around the structure and we were able to start putting the beams and joists in place. This was very tedious and time-consuming because everything else for the build relies on them. We have to ensure everything is level and plumb in order to make a very well-made and secure frame for the rest of the build.

We also had to set a lot of beams then make multiple readjustments to ensure alignment and correct angles. We referenced the 3D models and construction documents so we knew every measurement was correct. With the joist and beams set, we can begin the next step which is cutting the pilings to correct heights for the deck and bridging from both sides.