With about a week and a half left of the design build, we are pushing out the final changes in our both our construction documents and mockups. We have begun to physically build the bar and reception desk. The components of our three moving walls have been ordered, and the studs are to be cut to their proper lengths at the start of the day.
Paint has been applied to some pieces. The grinder burns hot with the finishing touches on the casters. It appears that we are set to finish building everything within the next week, by the deadline of May 1st. However, it requires us to make few, if any, mistakes along the way. The construction of our projects for REDUX continues on.