We Made It!

Yesterday evening around 5:45, we arrived to Clemson for our weekend of helping build the Solar D project. At 6:00 everyone met at Rick's Pizza Pub in Pendleton. At dinner, we got to meet with the rest of the Indigo Pine team. We also went over the initial itinerary for tomorrow and the rest of [...]

Wrapping Up The Weekend!

What a weekend!! Though a tiring weekend, it was so much fun meeting the Solar D team and starting the mock-up construction of Cropstop 2 with the sim[ply] construction method. During the construction we took notes on improvements that can be made for the future Cropstops. The Solar D team also took notes on how [...]

Pop Revit

3D model in Revit Elevations of each wall Separately from the Mystery Mockup, but still very much connected to it in the methodology, is the full spectrum of the interior to the Solar Decathlon cabinetry.  While the mockup was altered slightly to test every element of the cabinets that needed to be tested, the full [...]

On The Way

http://www.rosebankfarms.com/ Rosebank ---- To get experience through the practice, on-the-spot investigation and case study are always shortcut for architects. So we visit Rosebank this afternoon to learn some ideas about a certificated GAP shed, actually I wish I could have done this field trip at the beginning of this semester. FloorPlan----Nicole’s plan combines modular and [...]

Design Development

At this point, we are about midway through the development of our individual designs for the GAP Shed.  Talking amongst the studio, it seems that there is a constant struggle between creating a cool and interesting design versus making the structure economical and easily built.  I believe we will learn a lot through this struggle [...]