Over the last 2 days, the students have been working extremely hard to prepare for the final concrete pour for today! Holes were dug, areas were leveled, framework was done, and rebars were placed. There was a lot to do so everyone definitely had to pull their weight. We were all very tired by the [...]
We’ll Have a Floor!
