Crop Stop 2

Friday before spring break we analyzed our digital model for crop stop 2 and looked for missing pieces on site. We created an inventory that contains pieces we already have at the shop, and made a note of the new pieces needed. During spring break we have received some redlines and feedback from the engineer, so now we are working on the permit set. We have made a lot of corrections on our drawings in order to make information consistent and relevant.  It is important for us to have all construction drawings organized because coordinated documents are essential to minimizing construction delays, misunderstandings, and subsequent cost overruns. 

1 Comment

Leave a ReplyCancel reply