Now that the studio is united into an 8 person team for the final wall design the work has been all about the details!  We are working to design the storage, compost, water collection and irrigation, as well as the planting system for the wall.  Many, many, many details need to be worked out and a last minute redesign of the form for part of the wall was completed to help us incorporate the design of these many systems into the single wall.  We only have another week and a half before spring break and construction is scheduled to begin when we return from our week long vacation the third week in March.

Click on the following link to see our spacing diagram for the wall 🙂  Wall Spacing Diagram